HVAC systems
Ball Corporation
1. The maintenance of the water cold chiller for the industrial cooling in the factory and improve its performance 2. The maintenance of the air cold chillers and improve its performance 3. main contractor for the central cooling system project with cooling capacity 200 L/s to supply water cold and it included.
2. Colling towers with 200 L/S (2 towers) 2. Water cooled chiller with cooling capacity 120 TR 3. Supply and install the main pump station for the factory (7 pumps) 4. Factory Main Electrical panels “Schneider”.
3. Supply and install 6 WTK heat exchanger .
4. Supply and install siemens motor.

HVAC systems
Atlantic Group
1. Maintenance and raise the efficiency of the industrial water cold chiller for the production line
2. Supply and install the ducting system for the central oven in the factory
3. Maintenance for the electrical panel cooling units

L’Oréal
Maintenance and raise the efficiency for the cooling chillers “CLIMAVENTA”.

HVAC systems
HB fuller
The contract for maintenance works for central air conditioning in the factory and includes
1. CLIMAVENTA chillers with cooling capacity120 T.R
2. Carrier Chiller with cooling capacity 50 T.R
3. Carrier Chiller with cooling capacity 25 T.R
4. Water cooled chiller for the production process with cooling capacity 70 T.R
5. Works of raise efficiency for the industrial mixers at the production line with re-insulation and cladding works
6. Supply and install the main pumps with pipe line for the chillers

HVAC systems
Danieli Italian company
EZZ Steel Factory “Suez branch”.
1. Installing,commissioning and start up for the cooling chillers for the main electrical room in.
2. Maintenance and raise the efficiency for the cooling chillers in the factory
3. Replacement and renewal of the damaged compressors for chillers at the factory

Eastern Company
Commissioning and start up for the central cooling towers.

Misr El-Hegaz Group
1. Replacement and renewal the condensers for the cooling systems in the factory and it includes
2. Replace the damaged components in the systems “compressors, valves, refrigerant, pipes, cleaning the systems, …etc”
3. Reinstall, commissioning and start up for the cooling systems

Class A
Installing, commissioning, startup and maintenance works for all the CLIMAVENTA Italian chillers for the company

HVAC systems
Better Mix concrete stations
1. Supply and install all the industrial colling station for the company in all its and it includes. Supply and install all the components (chillers,pipes, pumps ,…etc) for the cooling station in the concrete plants (4 stations)
2. Insulation and cladding for the main cooled water tanks for the plants with capacity of 120 m3 (8tanks)

HVAC systems
Hany Saad Innovations
– Supply and install the cooling chiller for Hany Saad’s villa with the pumps and pipe lines which is required for the systems – Supervising for the installing of HVAC system. – Maintenance for the HVAC system.

Compound El-Gezira
Maintenance and raise the efficiency for the center HVAC systems for the residential villas and the social club.

HVAC systems
El Bardi Paper Mill (fine)
Supply , install, commissioning and start up for the HVAC system for MCC room with 8 DX units ( 38BB-250) split unit
we have also an annual contract for enclosure units and DX units

Hyper plus
Supply and install the ducting works for the central ovens in the hyper

HVAC systems
Tiba for trading and distribution [Juhayna Group]
– Replacement and renewal for the cold stores [7 stores allover Egypt]. – Maintenance for the cold stores all over egypt
El Dawleya For Modern Food Industries Co. [Juhayna Group]
– Supply and install the HVAC system for IT rooms. – Maintenance and raise the efficiency for the central and freezing and cold stores – Maintenance for the central HVAC system for administration building

HVAC systems
Galleria 40 October
– Supply, install, commissioning and startup for the HVAC systems and it includes:
1. Design the system
2. Supply all the components [chillers, AHU,FCU, ducts,…etc]
– Supply, install, commissioning and start up for Firefighting system and it includes
1. Design the system
2. Supply all the components [pipes,pumps, sprinklers,……etc].

Lafarge
Maintenance the water cold chillers with cooling capacity 100 T.R.

HVAC systems
International Company for Food Industries ICFI (COOKDOOR)
– Maintenance the central HVAC system with all it’s attached and equipment. – Maintenance the cooling and freezing central stores. – Replacement and renewal for the compressors.

HVAC systems
El-Kenanah Farm (El-Hegaz Group)
Install, commissioning and startup for two cooling stores with cooling capacity 7.5 HP.
Residential villa for Mr. Abd El sallam Hegazy
(El-Hegaz Group) Maintenance and raise the efficiency for the HVAC system and it’s attached [Chillers, AHU, FCU, pumps,pipes, Electrical panels,….etc]
El-Sabeel Automated slaughterhouse (El-Hegaz Group)
Modify the controller for the McQuay cooled chiller with cooling capacity 100 T.R.
El-Rabee Hatchery laboratory
Install, commissioning and startup for 3 central HVAC systems with cooling capacity 150 T.R

HVAC systems
SODIC Properties
– Supply and install all the system component for HVAc systems for residential villas [2 villas].

Delta for Packing and printing [DTPP]
– Maintenance the water cold chillers systems for the production line process.

HVAC systems
Jotun Egypt
Maintenance the water cold chillers systems for the production line process.

Ghabbour Group
Maintenance and renewal for the HVAC system for the main administration building

Cairo International Airport
[DHL] Instal two freezing rooms with cooling capacity 20 HP and a temperature of (-18o)

HVAC systems
El-Rabee Hatchery laboratory
Install, commissioning and startup for 3 central HVAC systems with cooling capacity 150 T.R

MAFA Organic
Install, commissioning and startup for the Fast-cooling rooms with all its’ attached with cooling capacity 40 hp for each room (6 Rooms)

HVAC systems
Blue Nile co. for Import & Export
[Desert station] 1. Replacement and renewal for two evaporators with cooling capacity 30 HP. 2. Install cooling two cooling units with cooling capacity 25 HP for each unite. 3. Install two fast-cooling units with all its’ attached 4. Install twohumidifiers
Blue Nile co. for Import & Export
[Al-Ayat station] – Install, commissioning and startup for a fast-cooling unit – Maintenance and raise the efficiency for the cooling stores units

HVAC systems
Beyti Egypt
– Install cooling two cooling units with cooling capacity 25 HP for each unite

Mido International Trading S.A.E
– Install a 40 HP cooling unite for a cooling tunnel (-30o) – Install a two-stage cooling process with cooling capacity 30 HB (-30O)

Cooling and Freezing rooms
Alaa El-Din slaughterhouse
– Instal,commissioning and startup for a freezing tunnel with a temperature of (-30O) – Instal,commissioning and startup for a cooling store with a temperature of (-10O)

Tiba for trading and distribution
[Juhayna Group] – Replacement and renewal for the cold stores (7 stores all over Egypt) Maintenance for the cold stores all over egypt

Cooling and Freezing rooms
marhba co. for Import & Export
– Install, commissioning and startup a fast-cooling stores with a cooling capacity of 25HP for each store.(2stores) – Install, commissioning and startup a freezing store with a cooling capacity of 25 HP for each store.(2 stores) – Maintenance for the cooling stores of the stations

Cooling and Freezing rooms
El-Dakhlya co. for Import & Export
– Modify and maintenance the cooling stores for the company in different stations.(20 stores)

EMETCO co. for import and export ghabbour Group
– Maintenance and raise the efficiency for the cooling-stores

Monastery of Saint Paul in Hurghada
Instal,commissioning and startup for a cooling -store with a cooling capacity 3 HP with all it’s attached

Amazon.eg
1- supply,install and start up DX split unit .
2-Textile Duct Work
Providing tools machines , labor and as required to execute the following: Supply, installation, testing and commissioning of Textile duct fabricated from endless fiber, anti-static and anti-bacterial material, complete with all required fitting “elbows & reducers”, perforation holes, textile nozzles from the same material as shown per drawings and specifications, in addition to all required supports &hangings elements required for installation and all necessary components and accessories required to complete the work professionally.
3- supply,install and start up fresh Air units
4- supply and install exhaust fan

Merage Mall:
1- supply and install split units
2- supply and install exhaust fan
3-Textile Duct Work for DX unit
Providing tools machines , labor and as required to execute the following: Supply, installation, testing and commissioning of Textile duct fabricated from endless fiber, anti-static and anti-bacterial material, complete with all required fitting “elbows & reducers”, perforation holes, textile nozzles from the same material as shown per drawings and specifications, in addition to all required supports &hangings elements required for installation and all necessary components and accessories required to complete the work professionally.
El Marakby steel :
supply, install and start up for cosmotec enclosure unit air condition (CVE15002208000_45)
Alautad :
Supply 4 cosmotec enclosure units air condition ( CVO20002208100-1Z ) to lybia

الخليجية للتصنيع (GM) :
Supply ,install and start up for 4 cosmotec enclosure unit AIR CONDITION (CVE20002208000_45) and 2 units (CVE40002208000_45)

DIMEC :
Supply ( Keypad Display XCB ) , ( Keypad Display ECB ) and ( Shipping and Delivery )

Egyvak (هيئة البحوث للامصال واللقاحات البيطرية ) :
1- Design, shop drawing and layout for all project
2- Supply , install and start up 2 carrier chiller(30RM-25) with all mechanical and electrical works .
3- maintenance for power chiller .
4- Supply and install the pipe system Single line layout for the cooling system.
5- Install the piping system that included the following:
6- Insulation of the piping system
Fiber glass 2” thickness
Cladding.
7- Electric panel MCC
8- Commissioning and start up the cooling system.
9- Supply and install pump

– We have a large number of cosmotec air cooled chillers
– heat exchangers Air to water 3 factories .
– Enclosure unit air condition .

We have a large number of cosmotec chillers and enclosure units air condition.